Two Women Contractors

Plumbing

Rough-in first, and the pretty part second

Shower pan waterproofed and sloped to the drain before tiling

Moving a shower, adding a basement bathroom or relocating a kitchen sink is drain and supply work before it is anything else. Getting the rough-in right is what allows the finish plumbing to look effortless.

We handle it as part of the remodel rather than subcontracting it out, which keeps the schedule in one pair of hands.

Get a free estimate

Navy vanity with a brass tap and a stone top, beside a blue tiled shower

Handling plumbing in-house offers several benefits

  • The job keeps moving

    No waiting a week for a separate trade to come and move one line before the tile can start.

  • The layout is not limited by the pipes

    If the room works better with the tub on the other wall, that becomes a decision rather than an obstacle.

  • Problems are found early

    Old supply lines and marginal drains show themselves during rough-in, when they are still cheap to deal with.

What we take on

  • Shower, tub and sink rough-in
  • Relocating supply and drain lines for a remodel
  • Fixture, faucet and vanity installation
  • Basement bathroom drainage
  • Repairs found during a project
Copper freestanding soaking tub against a marble-look tiled wall
Bathroom vanity and mirror beside an alcove tub

As with the electrical, if something turns out to be beyond the scope of a remodel we will tell you straight rather than papering over it.

Call for a free estimate.